Telescopic Post
Place of Origin: |
Guangdong, China (Mainland) |
Product Detail
Installation illustration:
1) You should drill a hole in the center you choose according to the
post level and lay the 150# cement sand liqui
Installation illustration:
1) You should drill a hole in the center you choose according to the
post level and lay the 150# cement sand liquid at the bottom of
the hole. The oozing hole should be left in the center of cushion
layer. We suggest enlarging the diameter of the cement cushion
layer and that the gravel is added under the cushion layer so that
the gravel can quicken the filter speed of the water when it is
buried in advance if it can be construct with the road at the same
time
2) Put post body into the hole and fill the peripheral chink with cement
and sand. Ensure that the post set cover is level with the ground and
that the stainless steel set cover is slightly higher than ground level
3) While installing, you should ensure vertical degree of the post.
Specifications:
1) Material: No. AISI304 stainless steel
2) Diameter: 114mm
3) Weight:24.33kg
4) Total height: 950mm
5) Thickness of pipe :3mm
6) Size of steel chain: 37 x 17 x 5mm
7) Weight of chain: 1.15kg,
8) Anti-pulling: >1600kg
Related Search
Find more related products in following catalogs on Hisupplier.com